1. Home
  2. Service Areas
  3. Jefferson County
  4. Raintree Plantation, MO

Asphalt paving in Raintree Plantation, MO

Driveways, club and common-area parking lots and private road work for a gated lake community in the Jefferson County hills.

Free estimates25% off

Map: Raintree Plantation, MO in Jefferson County, 34 miles southwest of downtown St. Louis MISSISSIPPIMERAMEC Raintree PlantationSt. LouisHillsboroCedar Hill LakesBriarwood EstatesCedar HillDe Soto
Raintree Plantation · Jefferson County34 mi southwest
CountyJefferson County
ZIP codes63050
From downtown St. Louis34 miles southwest
Community typeUnincorporated (CDP)

Main routes: Highway B

Hot-mix asphalt, laid right in Raintree Plantation

Raintree has about 39 miles of road inside the gates, which is more pavement than plenty of incorporated towns look after. Add 3,162 building lots and a country club, and driveways, lot work and private road repair all sit on the same property.

Since the developers handed the roads and amenities to the property owners association in 1984, that network has been the community's own responsibility. We pave and rebuild driveways on the lots, parking for the club and common areas, and stretches of private road where the base has given out. The ground rolls, with Autumn, Spring, Summer and Winter lakes collecting runoff, so drainage planning comes before asphalt. Free estimates, and you get 25% off.

Asphalt paver loaded with hot mix paving over a white gravel country driveway under shade trees

Driveway paving in Raintree Plantation

Lots here sit on rolling ground, so many drives run down to a house set below the road or climb up from it. Either way, water has to leave before it reaches the garage or the lake edge. We cut the grade, correct soft subgrade with compacted rock, and place a typical 2 to 3 inches of hot mix on a home drive. Edge support matters on any drive cut into a slope.

Driveway paving

Parking lot paving in Raintree Plantation

Parking at the country club, the common areas and the lake accesses fills in bursts and sits mostly empty the rest of the week. That pattern still calls for a base sized to maintenance trucks and delivery vehicles. We slope the surface toward planned outlets, keep runoff away from the immediate lake edge, and stripe once the asphalt has cured.

Parking lot paving

Road construction & private roads

Thirty-nine miles of private road is a maintenance program, not a single job. We can rebuild the worst stretches, overlay sections whose base is still sound, and stage the rest over time. Grading, culverts and ditch work come first on every stretch, since drainage decides how long the pavement above it lasts.

Road construction

General asphalt paving & repair

Farm yards, equipment pads, church lots and long country drives around Raintree Plantation each carry different loads. We size the base and the asphalt to the traffic that will actually use it, then compact every layer so it stays put.

Asphalt paving
Freshly paved black asphalt driveway curving through a green lawn toward a large shade tree and split-rail fence
Freshly paved black asphalt driveway curving through a green lawn toward a large shade tree and split-rail fence

Also available in Raintree Plantation

Why the base matters in Raintree Plantation

Rolling hills with man-made lakes give runoff plenty of grade to work with and somewhere to collect. Jefferson County ground is cherty red clay over limestone on many slopes, which drains unevenly. Freeze-thaw winters then work into anything that stayed wet. Ditches, culverts and a compacted base are what hold pavement steady.

When you compare bids, ask each contractor for three numbers in writing: the compacted asphalt thickness, the base depth, and what happens to the water. Those three decide how long the surface lasts.

Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving

Typical ranges. Your Raintree Plantation estimate is sized to the soil, the traffic and the drainage on your property.

Cross-section of an asphalt driveway From top to bottom: compacted hot-mix asphalt surface, compacted crushed-stone base, and prepared subgrade soil, with the surface sloped so water runs off. Slope sheds water Hot-mix asphalt 2 to 3 in., rolled hot Crushed-stone base Subgrade, soft spots dug out Typical driveway, not to scale
Yellow tandem roller drum compacting fresh asphalt on a residential driveway beside a green lawn
Yellow tandem roller drum compacting fresh asphalt on a residential driveway beside a green lawn

Raintree Plantation paving questions

Straight answers for Raintree Plantation homeowners and property managers. Anything else, call (866) 490-7680.

Do you work with property owners associations on road projects?

Yes. A private road network is usually handled as a phased program with a board, and we can price stretches separately so the association can weigh cost against condition. Putting the scope in writing up front keeps everyone looking at the same plan.

Can a gravel section inside the gates be paved?

Usually. Existing rock can often be reshaped and compacted into the new base, which saves material. What matters more is where the water goes: a gravel stretch that has held up may be relying on a ditch or culvert that has to stay in the design.

Do you pave in Raintree Plantation in the winter?

Hot-mix asphalt needs warm air and warm ground to compact properly, and the plants serving Raintree Plantation typically run from spring into late fall. Winter is a good time to get your estimate and book a spot for the season.

Will asphalt hold up to farm equipment and delivery trucks?

It can, but it has to be built for that load. On Raintree Plantation properties, heavy equipment needs a deeper base and a thicker mat than a car driveway. Tell us what actually drives on it, including grain trucks and trailers, and the estimate is sized to that.

Neighbors of Raintree Plantation

We pave all around Raintree Plantation, across Jefferson County and the rest of greater St. Louis on both sides of the river.

All 25 Jefferson County communities

Every town we serve

TownCountyMiles from Raintree Plantation
Hillsboro, MOJefferson County2.4
Cedar Hill Lakes, MOJefferson County6.0
Briarwood Estates, MOJefferson County6.9
Cedar Hill, MOJefferson County7.4
De Soto, MOJefferson County8.2
Horine, MOJefferson County9.3
Scotsdale, MOJefferson County9.7
Festus, MOJefferson County10.7
Pevely, MOJefferson County11.2
Herculaneum, MOJefferson County11.4

Paving in Raintree Plantation? Get a price.

Free on-site estimates and 25% off. Driveways, parking lots and private roads in Raintree Plantation and the towns around it.

Free estimate in Raintree Plantation

Tell us what you want paved and where. We'll call to set up a time to walk the site, measure, and give you a written quote with your 25% off.

  1. Send the form or call. We reply to set a time.
  2. We walk the site, measure and talk through options.
  3. You get a quote with your 25% off, and straight answers on base, thickness and drainage.
Rather talk now?(866) 490-7680

We only use your details to contact you about this project (privacy policy). This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.