Why the base matters in Raintree Plantation
Rolling hills with man-made lakes give runoff plenty of grade to work with and somewhere to collect. Jefferson County ground is cherty red clay over limestone on many slopes, which drains unevenly. Freeze-thaw winters then work into anything that stayed wet. Ditches, culverts and a compacted base are what hold pavement steady.
When you compare bids, ask each contractor for three numbers in writing: the compacted asphalt thickness, the base depth, and what happens to the water. Those three decide how long the surface lasts.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Raintree Plantation estimate is sized to the soil, the traffic and the drainage on your property.