Ground, water and winter in Riggston
Ground out this way is silt and clay heavy, the kind that holds water and shifts with every freeze and thaw. Drainage does most of the work in keeping pavement sound. We take out soft material, compact base rock in lifts, crown the surface, and set grades so water clears quickly instead of standing along an edge.
Bids are only comparable when they spell out the same things: base depth, compacted thickness, how edges are finished, and where water is meant to go. Ask for those before you pick a number.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Riggston estimate is sized to the soil, the traffic and the drainage on your property.