Built for Byrnes Mill's ground
Valley ground and hill ground behave differently. Bottom land stays wet, while the clay-heavy soils common in the region swell and shrink through the year. Water trapped in a base freezes, lifts the surface and leaves a pothole when it thaws. Drainage first, compaction second, asphalt last.
Bids are only comparable when they spell out the same things: base depth, compacted thickness, how edges are finished, and where water is meant to go. Ask for those before you pick a number.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Byrnes Mill estimate is sized to the soil, the traffic and the drainage on your property.