Driveway paving in Eureka
Ridge driveways off Highway 109 run long and steep, and they collect the water coming off the hill above them. We break the grade so runoff leaves sideways, rebuild the base where it has washed, and place hot mix, typically 2 to 3 inches compacted for cars and light trucks. Drives in the flatter neighborhoods get the same base work with more attention at the apron.
Driveway paving


