Ground, water and winter in Scottville
The headwaters of Rock Branch flow through Scottville toward Apple Creek, a tributary of the Illinois River. Ground that stays wet under pavement is the problem, especially with the clay-heavy soils common in the region and hard freeze-thaw winters. We grade so runoff leaves the surface quickly, compact the base in layers and support the edges.
Bids are only comparable when they spell out the same things: base depth, compacted thickness, how edges are finished, and where water is meant to go. Ask for those before you pick a number.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Scottville estimate is sized to the soil, the traffic and the drainage on your property.