What's under a Waverly driveway
Most of the city drains south to tributaries of Apple Creek, with the northeast corner running toward the South Fork of Lick Creek. Between those drainages the ground is flat and gives up water slowly. Clay-heavy soils hold it and freeze-thaw winters lift what sits on it, so we cut out soft soil and compact rock in layers.
Before you sign anything, get the base depth and the compacted asphalt thickness on paper. Two bids that look far apart are often just two different pavements.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Waverly estimate is sized to the soil, the traffic and the drainage on your property.