Built for Caledonia's ground
Ozark hill ground means thin soil over rock in places, pockets of clay in others, and slopes that move water fast. The Goose Creek bottoms stay wet longer than the ridges. Freeze-thaw winters push trapped water right through a surface. We grade for runoff, compact the base and keep the finished edges supported.
Before you sign anything, get the base depth and the compacted asphalt thickness on paper. Two bids that look far apart are often just two different pavements.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Caledonia estimate is sized to the soil, the traffic and the drainage on your property.