1. Home
  2. Service Areas
  3. St. Francois County
  4. Lake Timberline, MO

Asphalt paving in Lake Timberline, MO

Driveways, common-area lots and lake roads inside the gates, north of Bonne Terre, with free estimates and 25% off.

Free estimates25% off

Map: Lake Timberline, MO in St. Francois County, 48 miles south-southwest of downtown St. Louis MISSISSIPPIMISSOURIMERAMEC Lake TimberlineSt. LouisBonne TerreSummer SetTerre du LacDeslogeLeadwood
Lake Timberline · St. Francois County48 mi southwest
CountySt. Francois County
ZIP codes63628
From downtown St. Louis48 miles south-southwest
Community typeUnincorporated (CDP)

Hot-mix asphalt, laid right in Lake Timberline

More than ten lakes and reservoirs sit in the valleys of Bee Run and Primrose Creek, dammed and draining toward the Big River. Wooded, rolling and gated, with an elected board of trustees running things. Driveways and parking areas are the steady work here, and every one of them has to handle hillside runoff.

The community lies northwest of Highway 67, about six miles north of Bonne Terre, right up against the Jefferson County line. Roads inside the gates are private, which changes who decides and who schedules. We build base first, then place hot mix, typically 2 to 3 inches compacted for a residential drive. Call (866) 490-7680 for a free estimate, and you get 25% off.

Asphalt paver loaded with hot mix paving over a white gravel country driveway under shade trees

Driveway paving in Lake Timberline

Wooded lots on a grade give you two problems: water coming down the hill and shade that keeps the surface damp. We shape the drive to shed runoff sideways, cut the ditch or set the culvert where it crosses, and compact rock in layers before paving. Hot mix runs typically 2 to 3 inches compacted for cars and pickups, thicker where a boat trailer turns.

Driveway paving

Parking lot paving in Lake Timberline

Common areas, a clubhouse, a boat ramp and the church or shop lots nearby all need a base sized for trucks and trailers. We plan the entrance, slope the surface to a planned low point and place asphalt in lifts. Millings compacted over a prepared base make a practical surface for overflow and trailer parking.

Parking lot paving

Road construction & private roads

Private roads inside a gated community carry everything: residents, contractors, trash trucks and trailers, over hills and around water. We grade, rebuild the rock base where it has failed, crown the surface, and set ditching and culverts so storms drain. Chip seal works on lower-traffic loops, with asphalt on the main runs.

Road construction

General asphalt paving & repair

Farm yards, equipment pads, church lots and long country drives around Lake Timberline each carry different loads. We size the base and the asphalt to the traffic that will actually use it, then compact every layer so it stays put.

Asphalt paving
Newly paved asphalt parking lot beside a brick industrial building with a grain elevator and bins behind
Newly paved asphalt parking lot beside a brick industrial building with a grain elevator and bins behind

Also available in Lake Timberline

Why the base matters in Lake Timberline

The lakes here are reservoirs built in creek valleys, so this ground moves water constantly. St. Francois County soils run thin over igneous rock on the knobs and red cherty clay on the dissected hills, and NRCS notes low strength for vehicle traffic on several soils, correctable with suitable base. Freeze-thaw winters do the rest.

Bids are only comparable when they spell out the same things: base depth, compacted thickness, how edges are finished, and where water is meant to go. Ask for those before you pick a number.

Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving

Typical ranges. Your Lake Timberline estimate is sized to the soil, the traffic and the drainage on your property.

Cross-section of an asphalt driveway From top to bottom: compacted hot-mix asphalt surface, compacted crushed-stone base, and prepared subgrade soil, with the surface sloped so water runs off. Slope sheds water Hot-mix asphalt 2 to 3 in., rolled hot Crushed-stone base Subgrade, soft spots dug out Typical driveway, not to scale
Freshly paved asphalt street through a brick townhome community, with a small roller compacting in the distance
Freshly paved asphalt street through a brick townhome community, with a small roller compacting in the distance

Lake Timberline paving questions

Straight answers for Lake Timberline homeowners and property managers. Anything else, call (866) 490-7680.

Who signs off on road work inside the gates?

The community is run by an elected board of trustees, so shared road work normally goes through that board rather than a city. We can put the scope, the phasing and the access plan in writing so the board has something concrete to review before anything starts.

Can you get a paver in through a gated entrance?

Usually yes. We check the gate width, the turning room and any weight limits on culverts and small bridges before scheduling. If a truck cannot make a turn, we plan staging outside and haul in smaller loads. That gets sorted during the free estimate.

Should I sealcoat my new driveway right away?

No. Fresh asphalt in Lake Timberline needs time to cure before it is sealed, typically several months and often up to a year. Sealing too early can trap oils in the pavement. After that, sealing every few years helps it resist water, sun and salt.

Will asphalt hold up to farm equipment and delivery trucks?

It can, but it has to be built for that load. On Lake Timberline properties, heavy equipment needs a deeper base and a thicker mat than a car driveway. Tell us what actually drives on it, including grain trucks and trailers, and the estimate is sized to that.

Neighbors of Lake Timberline

We pave all around Lake Timberline, across St. Francois County and the rest of greater St. Louis on both sides of the river.

All 15 St. Francois County communities

Every town we serve

TownCountyMiles from Lake Timberline
Bonne Terre, MOSt. Francois County5.3
Summer Set, MOJefferson County6.4
Terre du Lac, MOSt. Francois County7.4
Desloge, MOSt. Francois County8.6
Leadwood, MOSt. Francois County9.6
Frankclay, MOSt. Francois County9.9
De Soto, MOJefferson County9.9
Mineral Point, MOWashington County10.2
Olympian Village, MOJefferson County10.7
Briarwood Estates, MOJefferson County11.1

Paving in Lake Timberline? Get a price.

Free on-site estimates and 25% off. Driveways, parking lots and private roads in Lake Timberline and the towns around it.

Free estimate in Lake Timberline

Tell us what you want paved and where. We'll call to set up a time to walk the site, measure, and give you a written quote with your 25% off.

  1. Send the form or call. We reply to set a time.
  2. We walk the site, measure and talk through options.
  3. You get a quote with your 25% off, and straight answers on base, thickness and drainage.
Rather talk now?(866) 490-7680

We only use your details to contact you about this project (privacy policy). This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.