Built for Summer Set's ground
Jefferson County is rugged Ozark border country, and slopes here shed water fast toward the lakes. That speed is the problem: runoff cuts along pavement edges and undermines them. We build ditches and edge support into the plan, remove soft soil, and compact the base in layers so freeze-thaw winters find nothing to lift.
Before you sign anything, get the base depth and the compacted asphalt thickness on paper. Two bids that look far apart are often just two different pavements.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Summer Set estimate is sized to the soil, the traffic and the drainage on your property.