Built for Evansville's ground
River bank ground drains unevenly and can stay wet long after the weather clears. Clay-heavy soils common through the region hold that moisture, and freeze-thaw winters lift the pavement sitting on it. We plan drainage first, dig out soft subgrade, compact clean rock in layers, and only then place asphalt.
A cheap bid usually gets cheap somewhere you cannot see. Ask what depth of stone goes down, how thick the asphalt is after rolling, and who fixes it if water still stands.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Evansville estimate is sized to the soil, the traffic and the drainage on your property.